1) Simple Styles (e.g., Linen Shirts, Tops)
Timeframe: 7–10 days
These styles typically involve straightforward pattern making and sample construction, with fewer revisions needed.
2) More Complex Styles (e.g., Linen Dresses, Pants, Skirts)
Timeframe: 10–14 days
Styles with multiple design details, such as pleats, embroidery, or specific fit adjustments, typically take a bit longer to sample.
3) New Designs or Custom Developments
Timeframe: 14–21 days
For brand-new styles or first-time linen products, sampling may take longer as manufacturers need to work through fabric sourcing, pattern making, and wash testing.